The executed this work in time & the test results are reviewed by our Subject Matter Expertise (SME) before delivering the final report to client. SME reviewed report will ensure that the engineering consultant will not have any surprises during detailed engineering.
Topo survey is carried out by DGPS & the contours are overlapped on to the drone image of the plot. Cutting-filling volume calculation with suitable FGL will be suggested to client.
In addition, we also supported client by availing grass cutting services which client is supposed to do before handing over the plot to us for Geotech & topo survey work.
This shows our commitment to support the client to complete the work in stipulated time period.
Compressor & engine mounted structural steel skid package is analyzed for Lifting Analysis for Kirloskar Pneumatics Pvt Ltd.
STRUCTPHIL's efforts to support client were appreciated for delivering this project in a very tight deadline as skid delivery was scheduled on very high priority.
Huge & eccentric weight on one side of the skid was the major challenge to manage center of gravity of the fabricated package as the weight of engine & compressor was on one side of the package.
This project is related to FEED study & Detailed Engineering to select the most suitable technology for the gas hydrocarbon dew point depression unit & installation of the same at onshore terminal. The project is awarded by Kirloskar Pneumatics Pvt Ltd. The scope of engineering is related to Electrical Engineering for Mechanical Refrigeration Package.
Scope of work includes cable tray routing & supporting, various layouts like earthing & lightning protection, lighting, etc. SLD preparations, review of datasheets, vendor GADs & control schematics, Lighting Lux calculations using Dialux software, etc.
We contributed to this project in Structural Engineering aspect. Scope of work was detailed engineering of pipe racks, pipe bridge, pipe & cable tray supports, some of the pumps & equipment foundations, PDC building supporting structure, etc.
Pipe racks & pipe bridges are modular structures mounted on top of stick-built columns. So, STRUCTPHIL also provided client lifting & transportation drawings for these modular structures.
RO Skid standardized package detailed engineering & design was completed for Wipro Water.
Challenge in this skid is to be design to be kept lightest & smallest possible sizes for supporting tubes in order to maintain desired gaps between tubes. Also, during lifting & transportation, the thin & slender structure should not have deflections causing disturbance to mounted tubes.
STRUCTPHIL delivered this package to fulfil client's requirements by providing hollow tubular steel sections.